Our house has one bathroom upstairs, and we thought it would be better to have second one downstairs. My husband has been planning this for several months and now that the weather is getting warmer, it’s a nice time to start tearing things down. Our house is 233 years old, so we learned a lot about how people built their homes way back when.
First thing we noticed was all the odds and ends that held together the walls. You won’t see a lot of nice, even 2x4s, but rather an assortment of wood pieces, whatever pieces could be salvaged and used as support while the main beams of the house were nice and sturdy. See where that red leveler is? That wide plank isn’t a support beam, but was probably used as a surface to nail the inside wall to.
Future site of new bathroom. There was no insulation in these two walls, so I stapled large table cloths over the doorways and pretty much avoided using this room all winter
Drainpipe in corner will be covered with drywall. Doorway will be from the porch. One more layer of flooring to be removed.
View from the porch. To the left of the opening is that framed-out drainpipe, door will go here. Coat closet on the right. Door to the kitchen hidden by hanging coats.
I think he’ll work on this over the weekend again, so I’ll post more pics soon…stay tuned!