Week 2 of the second bathroom installation!

A little more work has been done by putting up studs (I helped a little with the shorter side):

Image

There wasn’t much room to work, so putting together the shorter side was REALLY difficult for my husband. It kept on falling apart here and there, so we had to improvise and lean the frame on the open door to the basement:

Image

Basement door in the back was open slightly, so the frame was leaning on top of it while I was holding one side and my husband was balancing on a step stool with one foot on the wall to nail the studs from the top.

Image

Bathroom fan will go above toilet. It will have a humidity sensor, so will automatically turn on to keep the room from getting too foggy.

There is some water damage from the upstairs bath, but we’re hoping it’s not too extensive and only the top layer will have to be replaced…but that’s for another renovation, and another post. :)

Plumbing is the next step, stay tuned!

Our house has one bathroom upstairs, and we thought it would be better to have  second one downstairs. My husband has been planning this for several months and now that the weather is getting warmer, it’s a nice time to start tearing things down. Our house is 233 years old, so we learned a lot about how people built their homes way back when.

First thing we noticed was all the odds and ends that held together the walls. You won’t see a lot of nice, even 2x4s, but rather an assortment of wood pieces, whatever pieces could be salvaged and used as support while the main beams of the house were nice and sturdy. See where that red leveler is? That wide plank isn’t a support beam, but was probably used as a surface to nail the inside wall to.

Bath_01

Future site of new bathroom. There was no insulation in these two walls, so I stapled large table cloths over the doorways and pretty much avoided using this room all winter

Bath_02

Drainpipe in corner will be covered with drywall. Doorway will be from the porch. One more layer of flooring to be removed.

Bath_03

View from the porch. To the left of the opening is that framed-out drainpipe, door will go here. Coat closet on the right. Door to the kitchen hidden by hanging coats.

I think he’ll work on this over the weekend again, so I’ll post more pics soon…stay tuned!